YOUR HOME BUILDING JOURNEY

Building with Montgomery Homes

Building a new home is one of the most significant investments you can make – both emotionally and financially. Whether you’re building your first home or your forever home, the building journey is exciting – and sometimes a little daunting!

When you choose Montgomery Homes as your builder, we will help you find the perfect home design, understand the complete building journey, and make sure you’re still smiling when we hand over the keys to your new home. We’ve refined this process to ensure you’re comfortable every step of the way.

See below our 11 Simple Steps to building your new home.

Adult and child playing on wooden staircase in a modern two-story home with white walls, glass railings, and natural light from large windows.

Your step by step building journey

  1. White paper house cutout placed on green grass with blurred green foliage background, representing property search or finding a home location.

    If you already have a block land or you’re planning to knock down and rebuild your existing home, you can tick this step off your list! Otherwise, our expert consultants can help you find a piece of land or a house and land package to suit your needs and budget. We strongly recommend taking a virtual or in-person tour of our display homes to gain an understanding of space, style, and floor plan options to suit your lifestyle, land, and budget. Our team will then work with you to modify the floor plan (if required) to truly personalise your home.

  2. Inspector in high-visibility safety vest holding a tablet and stylus, conducting a site inspection outdoors with a building window visible in the background.

    Once you’ve chosen your new home design, we will provide a free site inspection to ensure your block of land is accessible and is suitable for construction and your desired home design. This will also ensure you’re aware upfront of any site-specific costs.

  3. Two people reviewing architectural floor plans and blueprints at a wooden table with coffee cups, a smartphone, and a laptop during a design or construction meeting.

    Your tender presentation appointment is our opportunity to showcase your selected home design and walk you through a detailed list of inclusions and current promotions that comprise your tender and quote. At this appointment, you’ll have the opportunity to ask questions and tour our selections gallery. Following your tender presentation, we will invite you to place your commencement fee so we can progress to the pre-construction phase and send your home design to our talented drafting team to begin drawing your plans.

  4. A surveyor in an orange safety vest holds survey papers and a pencil while reviewing contour survey data on a construction or land survey site, with surveying equipment and markers visible in the blurred background.

    After the commencement fee has been received we will procure a contour survey which will provide details on site levels, boundaries and any easements which will enable us to correctly position your home on your block. A geotechnical engineer will carry out a site classification investigation which will provide details on the soil type, site classification, rock depth and any other site conditions we may need to be aware of.

  5. Two professionals reviewing tender documents together at a desk, with one person pointing at a spreadsheet while the other uses a laptop, surrounded by papers and a pen.

    Once the survey has been received, our drafting team will ensure the perfect positioning of your home on the block. We pride ourselves on our ability to build site-specific homes to ensure we enhance all available views, breezes, natural light, ventilation, and drainage. An updated tender and your plans will be sent to you for review, and we’ll schedule a follow-up meeting where you can make any final changes before progressing to contract signing. Now is the time to ensure you are able to obtain Proof of Funds for the build.

  6. Person signing a contract document with a pen, holding the paperwork with one hand while writing with the other.

    On acceptance of your Lodgement Plans, our Contracts Administrator will develop your HIA contract. It is at this time that your 5% deposit is due. We will be in touch to arrange a HIA contract signing appointment.

  7. Two people reviewing interior design material selections laid out on a concrete surface, including fabric swatches, color palette fan, wood samples, and black and white material samples arranged in an organized grid layout.

    This is where things really get exciting! Our qualified interior designer, kitchen, electrical, and flooring consultants will be in touch to organise your selections appointments. This is where you will choose your internal and external colours, appliances, fixtures, and fittings. Our selections guide is a fantastic resource to help you prepare for your appointments.

  8. Person holding hands over laptop keyboard with three translucent document icons floating above the screen, representing digital file approvals and document management workflow.

    From here, we will forward your plans to the applicable regulatory bodies such as BASIX, local water authority, mine subsidence board, estate developer approval, etc. Our qualified planners will then lodge your house plans with council for DA approval or with a private certifier for CDC approval. Approval time varies between council areas and the private certifier can take up to four weeks. *If you’re planning a knock down rebuild, this is the time to organise demolition. Get in touch and ask for a copy of our Demolition Fact Sheet.

  9. A wooden house-shaped cutout placed on an open calendar showing December dates, alongside a yellow pencil and a white calculator on the right side, arranged on a light background.

    Montgomery Homes will provide a copy of construction variation documents, construction plans, construction tender and final selections. Your Proof of Funds will be required at this stage and site preparation must be undertaken — including scraping of the site (encompassing grass, shrubs and weeds).

  10. Yellow excavator dumping soil from its bucket during site preparation work, with dust billowing in the air and the machine's cab visible on the right side of the image.

    Excavation is a crucial step in preparing your block for the build. This process involves cutting, filling and compacting the site to the required levels. If the soil needs more stabilisation, we will install screw or concrete piers to support and level your foundations in preparation for your slab to be poured. Once the site is ready, our trusted sub-contractors will install connections to plumbing and electrical prior to the slab being poured. The slab will then be poured and termite protection materials will be installed. A temporary site fence will also be erected.

  11. Construction site with concrete foundation being poured using a green pump truck with extended boom. Workers in high-visibility vests oversee the operation on a dirt lot surrounded by metal fencing, existing buildings, and trees under partly cloudy sky.

    From here, the only way is up - frames are erected and you have the exciting experience of seeing your dream home come to life!

White paper house cutout placed on green grass with blurred green foliage background, representing property search or finding a home location.

Step 1

Find your block of land and dream home design

If you already have a block land or you’re planning to knock down and rebuild your existing home, you can tick this step off your list! Otherwise, our expert consultants can help you find a piece of land or a house and land package to suit your needs and budget. We strongly recommend taking a virtual or in-person tour of our display homes to gain an understanding of space, style, and floor plan options to suit your lifestyle, land, and budget. Our team will then work with you to modify the floor plan (if required) to truly personalise your home.

Inspector in high-visibility safety vest holding a tablet and stylus, conducting a site inspection outdoors with a building window visible in the background.

Step 2

Site inspection

Once you’ve chosen your new home design, we will provide a free site inspection to ensure your block of land is accessible and is suitable for construction and your desired home design. This will also ensure you’re aware upfront of any site-specific costs.

Two people reviewing architectural floor plans and blueprints at a wooden table with coffee cups, a smartphone, and a laptop during a design or construction meeting.

Step 3

Tender presentation and sign off

Your tender presentation appointment is our opportunity to showcase your selected home design and walk you through a detailed list of inclusions and current promotions that comprise your tender and quote. At this appointment, you’ll have the opportunity to ask questions and tour our selections gallery. Following your tender presentation, we will invite you to place your commencement fee so we can progress to the pre-construction phase and send your home design to our talented drafting team to begin drawing your plans.

A surveyor in an orange safety vest holds survey papers and a pencil while reviewing contour survey data on a construction or land survey site, with surveying equipment and markers visible in the blurred background.

Step 4

Contour Survey & Site Classification Investigation

After the commencement fee has been received we will procure a contour survey which will provide details on site levels, boundaries and any easements which will enable us to correctly position your home on your block. A geotechnical engineer will carry out a site classification investigation which will provide details on the soil type, site classification, rock depth and any other site conditions we may need to be aware of.

Two professionals reviewing tender documents together at a desk, with one person pointing at a spreadsheet while the other uses a laptop, surrounded by papers and a pen.

Step 5

Contour survey received and Tender updated with your final changes

Once the survey has been received, our drafting team will ensure the perfect positioning of your home on the block. We pride ourselves on our ability to build site-specific homes to ensure we enhance all available views, breezes, natural light, ventilation, and drainage. An updated tender and your plans will be sent to you for review, and we’ll schedule a follow-up meeting where you can make any final changes before progressing to contract signing. Now is the time to ensure you are able to obtain Proof of Funds for the build.

Person signing a contract document with a pen, holding the paperwork with one hand while writing with the other.

Step 6

Contract Signing

On acceptance of your Lodgement Plans, our Contracts Administrator will develop your HIA contract. It is at this time that your 5% deposit is due. We will be in touch to arrange a HIA contract signing appointment.

Two people reviewing interior design material selections laid out on a concrete surface, including fabric swatches, color palette fan, wood samples, and black and white material samples arranged in an organized grid layout.

Step 7

Selections appointment

This is where things really get exciting! Our qualified interior designer, kitchen, electrical, and flooring consultants will be in touch to organise your selections appointments. This is where you will choose your internal and external colours, appliances, fixtures, and fittings. Our selections guide is a fantastic resource to help you prepare for your appointments.

Person holding hands over laptop keyboard with three translucent document icons floating above the screen, representing digital file approvals and document management workflow.

Step 8

Approvals

From here, we will forward your plans to the applicable regulatory bodies such as BASIX, local water authority, mine subsidence board, estate developer approval, etc. Our qualified planners will then lodge your house plans with council for DA approval or with a private certifier for CDC approval. Approval time varies between council areas and the private certifier can take up to four weeks. *If you’re planning a knock down rebuild, this is the time to organise demolition. Get in touch and ask for a copy of our Demolition Fact Sheet.

A wooden house-shaped cutout placed on an open calendar showing December dates, alongside a yellow pencil and a white calculator on the right side, arranged on a light background.

Step 9

Final documents, proof of funds and site preparation

Montgomery Homes will provide a copy of construction variation documents, construction plans, construction tender and final selections. Your Proof of Funds will be required at this stage and site preparation must be undertaken — including scraping of the site (encompassing grass, shrubs and weeds).

Yellow excavator dumping soil from its bucket during site preparation work, with dust billowing in the air and the machine's cab visible on the right side of the image.

Step 10

Earthworks and utility connections

Excavation is a crucial step in preparing your block for the build. This process involves cutting, filling and compacting the site to the required levels. If the soil needs more stabilisation, we will install screw or concrete piers to support and level your foundations in preparation for your slab to be poured. Once the site is ready, our trusted sub-contractors will install connections to plumbing and electrical prior to the slab being poured. The slab will then be poured and termite protection materials will be installed. A temporary site fence will also be erected.

Construction site with concrete foundation being poured using a green pump truck with extended boom. Workers in high-visibility vests oversee the operation on a dirt lot surrounded by metal fencing, existing buildings, and trees under partly cloudy sky.

Step 11

Construction is underway!

From here, the only way is up - frames are erected and you have the exciting experience of seeing your dream home come to life!

Terry and Katrina

After building their first Montgomery Home 25 years ago, Terry and Katrina only ever dreamed of building again. But as the years went on, the couple knew they needed more space to accommodate their growing family. Learn more about their journey of finding a house to knock down and rebuild.

Keith and Cheryl

Keith and Cheryl were planning their retirement in the stunning Northern Beaches and wanted to be able to help their son and his family enjoy the same beautiful lifestyle near the beach. They seized the opportunity to secure a sloping block of land and built a split level home that easily accommodated them all. Discover how the two families were able to live independently in their brand new home.

FAQs

At Montgomery Homes we understand that building a new home is an exciting life milestone, and we build every home as if it were our own - ensuring quality from the inside out. The timeframe for building a new home varies according to a number of factors including, but not limited to - the home design selected (single-storey vs double-storey or split-level), the individual specifications of the block of land (including site accessibility and condition), and external approvals (such as local council and BASIX). Behind every Montgomery Homes build is a team who are passionate about seeing your dream home come to life. Please get in touch with our team to enquire about the build timeline for your new home.

Building a new home is one of the most exciting journeys you will embark on. To prepare for the journey ahead, there are a few things you can prepare to reduce any pressure or stress on you and your family, such as short-listing homes that you like, generating a list of ‘must have’ items, gaining pre-approval, and saving colours and materials you might like to use on your new home.

Before choosing a home builder, it is important to understand their pre-construction processes to avoid any potential delays in getting your home into construction. Some builders can take more than six months to submit plans to your local council, whereas Montgomery Homes have in-house drafting and planning teams that regularly monitor the progress of your submission in an effort to have your plans approved as soon as possible.

Your sales executive will provide you with a free detailed tender to itemise everything required to build your new home. Once you are happy with the initial home design draft and the tender quote, we will invite you to pay your $7,500 commencement fee to progress and ensure you receive your promotional offers. This is the only payment necessary until you sign your building contract. Once your deposit is received, we will prepare an updated tender with any requested changes. Next, you will proceed to drafting which allows us to begin your final plans.

Building Process

How long does it take to build a house?

At Montgomery Homes we understand that building a new home is an exciting life milestone, and we build every home as if it were our own - ensuring quality from the inside out. The timeframe for building a new home varies according to a number of factors including, but not limited to - the home design selected (single-storey vs double-storey or split-level), the individual specifications of the block of land (including site accessibility and condition), and external approvals (such as local council and BASIX). Behind every Montgomery Homes build is a team who are passionate about seeing your dream home come to life. Please get in touch with our team to enquire about the build timeline for your new home.

What do I need to do to prepare for a new home build?

Building a new home is one of the most exciting journeys you will embark on. To prepare for the journey ahead, there are a few things you can prepare to reduce any pressure or stress on you and your family, such as short-listing homes that you like, generating a list of ‘must have’ items, gaining pre-approval, and saving colours and materials you might like to use on your new home.

How long does the pre-construction stage take?

Before choosing a home builder, it is important to understand their pre-construction processes to avoid any potential delays in getting your home into construction. Some builders can take more than six months to submit plans to your local council, whereas Montgomery Homes have in-house drafting and planning teams that regularly monitor the progress of your submission in an effort to have your plans approved as soon as possible.

How much will I need to pay upfront?

Your sales executive will provide you with a free detailed tender to itemise everything required to build your new home. Once you are happy with the initial home design draft and the tender quote, we will invite you to pay your $7,500 commencement fee to progress and ensure you receive your promotional offers. This is the only payment necessary until you sign your building contract. Once your deposit is received, we will prepare an updated tender with any requested changes. Next, you will proceed to drafting which allows us to begin your final plans.

Get started with a free design consultation today

Our team can help find the best home for your family

Australian numbers preferred.
Building Journey
Building Journey
Building Journey
Optional — tell us anything we should know.

Testimonials

Building Journey

Our new home was built in record time. Quality and build were all up to a good standard. Issues were dealt with promptly and rectified. The entire build was very well managed by our site supervisor.

Alister

Building Journey

A positive build experience. I would say similar quality to a custom build, but at an affordable price point.

Bentley

Building Journey

"Happy from the very first stage to the very end, it has been a breeze... The quality of the build is perfect and a big thank to my Site Supervisor who always kept me up-to-date with the progress. Overall, I'm extremely happy I chose Montgomery. Thank you for everything, it is truly beautiful and we love it!"

Ingrid, Hunter Region

Building Journey

“We are really impressed by the process / system you have in place to keep your clients up to speed with what to expect and what the progressive steps are during the entire process. i.e. from initial signing through to handover and everything required during. We have built before with other builders and genuinely feel that this process and the people we’ve dealt with made building with Montgomery Homes a step well above what we have experienced before.”

Venn, July 2020, Eleebana

Building Journey

“Easy, friendly, stress-free, professional team! Kyle has exceptional organisational skills!! Would definitely build with Montgomery again ☺”

Sexton, Raworth

Building Journey

“Would recommend Montgomery Homes. Communication with supervisor was excellent. Build went well considering this is our first build.”

Lewis, Medowie